Changes in a Zhangjiagang chemical new materials customer after using Como for two months
At the end of November 2018, we installed a Como water treatment system in the cooling circulating water system pump room of a chemical new materials company in Zhangjiagang. The purpose was to replace chemicals and improve water quality: the system not only had localized scaling issues but also more widespread corrosion problems (the incoming water was slightly acidic)。
(On-site installation diagram)
After using the chemical agent for just over a month, corrosion spots are already clearly visible on the hanging piece.
After a few days of installation and use, Party A confirmed that the turbidity in the circulating water tank could be judged by the naked eye. In mid-December, the chemical company completed the final test, and then, except for retaining a small amount of alkali (as the incoming water was slightly acidic), all other chemicals were stopped. In the final water quality test, it was found that the total iron had significantly increased: from around 1mg/l previously to over 4mg/l。This is the result of the rust being stripped away along with the scale during the Como signal descaling process. As the scale is completely removed, the total iron content will gradually decrease. This was confirmed in subsequent weekly water sample tests。
Zhangjiagang XXXX Chemical New Materials Water Quality Test Results
NO. |
Test Subject |
Unit |
18-12-25号 |
19-01-02号 |
19-01-09号 |
19-01-16号 |
Remarks |
1 |
Total hardness |
mg/l |
145 |
120 |
90 |
115 |
|
2 |
specific conductance |
μs/cm |
1600 |
1600 |
1700 |
1300 |
|
3 |
total alkalinity |
mg/l |
25 |
45 |
90 |
105 |
|
4 |
SO42- |
mg/l |
29 |
- |
- |
- |
|
5 |
Cl- |
mg/l |
19.5 |
- |
- |
- |
|
6 |
total iron |
mg/l |
0.86 |
0.17 |
0.15 |
0.06 |
|
Summaries: From the four water quality tests, the corrosion problem of the system has been significantly suppressed. At the same time, it can be judged that a small amount of old scale has also been basically removed cleanly。
Attachment 1: Two Routine Tests by Chemical Pharmaceuticals, Inc
Date |
pH |
conductivityμs/cm |
turbidity, mg/L |
calcium hardness mg/L |
total hardnessmg/L |
total alkalinitymg/L |
chloride ion mg/L |
Fe,mg/L |
chemical concentration,mg/L |
12月14日 |
7.2 |
286 |
1.6 |
119.15 |
324.08 |
21.33 |
53.38 |
4.58 |
125 |
Attachment 2: On-site water tank corrosion and the effect of the new hanging piece for 2 months
(Water tank corrosion)
(The effect of 2 months of new hangings)
Cooling system descaling and anti-scaling
Steam boiler scale control
Scale-prevention of hot water boiler
Waste heat boiler scaling
Waste heat recovery equipment scaling
Thermal center scaling and anti-scaling
Reverse osmosis membrane scale removal and anti-fouling
Descaling and Fang of plate heat exchanger
Descaling and fang of steam generator
Air can remove scale and prevent scale from water heaters
Shell and tube heat exchanger scale removal and prevention
Kitchen equipment scale control
Central air conditioning system scale control
Hotel hotel scale control
Chemical plant scale removal and control
Descaling and anti-scaling in mining and metallurgical plants
Hospital scale removal and prevention
Descaling and deterring of iron and steel works
Mining plant scale removal and control
Air compressor scale control
Power plant scale removal and control
Cleaning and preventing scale in paper mill
Scale removal and anti-scaling in electronics factory
Electroplating plant scale control
Cleaning and preventing scale in printing and dyeing plant
Cleaning and preventing scale in food factories
Domestic hot water system to remove and prevent scale